Daode 49.5MW Wind Power Project
#210of 1935 in Renewable energy#70of 1084 in China#126of 1459 in CDM (UNFCCC)#149of 1287 in ACM0002
Audit Analysis
The Daode 49.5 MW wind project is a straightforward CDM renewable-energy credit with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. No material findings or corrective actions were reported, and the 0% leakage deduction is appropriate for a wind project. The principal concern is that the verified emissions reduction (99,524 tCO₂e) covers only the first ~1.8 years of a 7-year crediting period and represents roughly 55% of the pro-rata PDD expectation, suggesting the ex-ante assumptions were optimistic.
Red Flags
- Verified ERR of 99,524 tCO₂e for ~1.8 years of operation is only ~55% of the pro-rata PDD expectation (~179,200 tCO₂e), indicating the PDD overestimated output or capacity factor
- Monitoring data available only through September 2019; no subsequent monitoring reports found for the remaining ~5 years of the crediting period (through December 2024)
- Additionality test type (investment, barrier, or regulatory) is not specified in the extracted record, limiting assessment of robustness
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 96,029 | 0 | 96,029 | |
| 2014 | 158,236 | 0 | 158,236 | |
| Total | 254,265 | 0 | 254,265 |
Risk Indicators
VVB-confirmed (CTC)
Avoidance project, no reversal risk
Negligible, appropriate for wind
Jurisdictional grid EF (2017)
Mentioned but not detailed
CDM; CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →