Skip to main content
CDMGeothermalIndonesiaACM0002

Darajat Unit III Geothermal Project

CDM-0673 ↗

#934of 1935 in Renewable energy#11of 33 in Indonesia#672of 1459 in CDM (UNFCCC)#729of 1287 in ACM0002

5.2/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
6.0

Audit Analysis

The Darajat Unit III geothermal project is a well-established avoidance-type CDM project with a valid barrier additionality test and no reversal risk, but it is undermined by three material contradictions across documents (leakage justification, baseline method, and ERR figures) and a notable absence of a verified ERR figure. The four closed CARs indicate the VVB process functioned, yet the unresolved inconsistencies between the monitoring report and the validation/PDD documents create meaningful uncertainty about the robustness of the credit claims.

Red Flags

  • Total ERR claimed differs by ~31% between the monitoring report (925,498 tCO₂e) and the validation report (705,394 tCO₂e); the basis for each figure is not clarified in the extracted record.
  • Leakage is recorded as 0% with the justification described as 'not addressed' in the monitoring report but 'deemed negligible' in the validation report — the two documents are inconsistent on a fundamental MRV element.
  • Baseline method is recorded as 'project-specific' in the monitoring report but 'jurisdictional' in the PDD, creating ambiguity about which baseline underpins the credit calculation.
  • No verified ERR figure is present in the extracted record; only the claimed figure is available, leaving the verification chain incomplete.

Credit Vintages

IssuedRetiredAvailable
2009
90,804090,804
2011
1,239,15601,239,156
2012
1,728,30601,728,306
2013
707,9660707,966
2014
609,1340609,134
2015
322,5390322,539
2017
1,562,70401,562,704
2022
2,006,87502,006,875
Total8,267,48408,267,484

Risk Indicators

Additionality

Barrier test applied but VVB confirmation not explicitly sta

Permanence

Avoidance project – no reversal risk; no reversal events rep

Leakage

0% deduction with contradictory justification across documen

Baseline

Method described inconsistently (project vs jurisdictional);

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002 ver. 16.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents