Skip to main content
CDMWindChinaACM0002

Datang Anzishan Wind Power Project

CDM-5733 ↗

#606of 1935 in Renewable energy#284of 1084 in China#412of 1459 in CDM (UNFCCC)#464of 1287 in ACM0002

5.6/ 10
Integrity
6.0
Transparency
4.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

The Datang Anzishan Wind Power Project is a standard CDM wind project with a verified additionality assessment, a jurisdictional baseline, and no material findings or corrective actions. However, the available documentation is limited to validation-level records with no monitoring reports, no FNRB specification, and no buffer pool or permanence safeguards documented. The project is structurally sound but lacks the depth of evidence needed for a higher confidence rating.

Red Flags

  • Leakage is set at 0% with only a 'deemed negligible' justification and no quantitative analysis in the available documents
  • No monitoring reports are present in the extracted record; the 502,222 tCO2e figure is the lifetime ex-ante estimate, not a verified monitoring-period result
  • Crediting period start date is inconsistent between the validation report (10 Feb 2019) and another source (2 Oct 2019)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% – deemed negligible, no quantification

Baseline

Jurisdictional, 2017 grid EF

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents