Datang Changqing Phase I Wind Power Project
#935of 1935 in Renewable energy#492of 1084 in China#673of 1459 in CDM (UNFCCC)#730of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and a reasonable 0% leakage deduction, but with notable gaps in the extracted record: the additionality test type, monitoring period, FNRB, and usage rates are all unstated. The ERR figures in the PDD and validation report are consistent once the difference in scope (lifetime vs. single monitoring period) is accounted for.
Red Flags
- Additionality test type and explicit VVB confirmation are not stated in the extracted record, leaving the robustness of the additionality assessment unverified
- Monitoring period, FNRB value/method, and both assumed and verified usage rates are absent from all available documents
- No monitoring report is present in the evidence set; only the validation report and PDD are available
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type and VVB confirmation not stated in extracted recor
Avoidance project; no reversal risk for wind
0% with 'deemed negligible' justification; appropriate for g
Jurisdictional baseline, grid EF 0.8404 (2017), reassessed 2
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →