Datang Dongping Wind Power Project
#541of 1935 in Renewable energy#246of 1084 in China#362of 1459 in CDM (UNFCCC)#410of 1287 in ACM0002
Audit Analysis
The Datang Dongping Wind Power Project is a CDM-registered wind facility in China validated by CTI, using a jurisdictional grid emission factor baseline appropriate for the technology. The primary concerns are the absence of explicit additionality test documentation in the extracted record and a discrepancy between the PDD lifetime estimate (561,379 tCO2) and the validation report figure (80,197 tCO2), which is most likely an annual-versus-lifetime reporting difference but reduces transparency. Leakage treatment and baseline methodology are sound for a wind project.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment undocumented in available sources
- The PDD reports a total ERR of 561,379 tCO2 while the validation report reports 80,197 tCO2 for the same field; although likely an annual-vs-lifetime basis difference (561,379 ÷ 7 ≈ 80,197), the inconsistency is not explicitly reconciled in the documents
- No monitoring report is present in the evidence set, so verified performance data beyond the validation-stage estimate cannot be independently confirmed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in extracted record; VVB validation imp
Wind technology; no carbon storage, no inherent reversal ris
0% deemed negligible; appropriate for grid-connected wind
Jurisdictional grid EF (0.8404, 2017); standard for CDM wind
Safeguards mentioned but FPIC, grievance mechanism, and bene
CORSIA and CCP status not stated; dual-channel risk not excl
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →