Datang Duolun Daxishan Farm II
#868of 1084 in China#1151of 1459 in CDM (UNFCCC)#1089of 1287 in ACM0002
Audit Analysis
A CDM wind project in China validated by CTI in 2019, using a jurisdictional grid-emission-factor baseline under ACM0002 v19.0. The project is structurally sound for a wind avoidance-type credit, but the extracted record contains two significant numerical contradictions (grid emission factor and total expected ER) and lacks any monitoring-period data, verified ER figures, or explicit additionality-test documentation, limiting confidence in the credit's integrity and transparency.
Red Flags
- Total expected ER differs by a factor of ~7 between the PDD (411,642 tCO2e) and the validation report (58,806 tCO2e), both dated within one day of each other in November 2019 — a major data-reliability concern
- Grid emission factor is 0.84045 tCO2/MWh in the validation report but 0.968 in an unidentified document, with no explanation for the discrepancy
- No monitoring reports, verified ER figures, or monitoring-period data were found in the available documents, leaving the project's actual performance unassessed
- Additionality test type and VVB confirmation are not explicitly stated in the extracted record, creating an evidence gap on a core CDM requirement
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 29,923 | 0 | 29,923 | |
| 2013 | 83,690 | 0 | 83,690 | |
| Total | 113,613 | 0 | 113,613 |
Risk Indicators
Test type not explicitly stated in extracted record
Avoidance-type wind; no inherent reversal risk
0% deemed negligible; reasonable for grid feed-in
Jurisdictional grid EF (2017); standard for CDM wind
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; dual-channel risk unconfir
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →