Skip to main content
CDMWindChinaACM0002

Datang Jingbian Renewable Power Co., Ltd. Yuanliangshan Wind Farm Project

CDM-7268 ↗

#936of 1935 in Renewable energy#493of 1084 in China#674of 1459 in CDM (UNFCCC)#731of 1287 in ACM0002

5.2/ 10
Integrity
5.2
Transparency
5.0
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A CDM wind farm project using the well-established ACM0002 methodology with a jurisdictional baseline and VVB-confirmed additionality. The core credit claim is sound, but the record lacks monitoring reports, safeguards documentation, and several MRV details, limiting confidence in ongoing performance tracking.

Red Flags

  • Safeguards are absent from the validation report and no FPIC or grievance mechanism is documented in any available record
  • One of the four source documents is listed as 'unknown', and no monitoring or verification reports are present in the extracted record
  • No buffer pool or explicit permanence mechanism is stated, though reversal risk is inherently low for a grid-connected wind project

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed

Permanence

Avoidance project, no reversal mechanism

Leakage

Negligible, appropriate for grid wind

Baseline

Jurisdictional, reassessed 2019

Safeguards

Not documented in VVB report

Double-claim

CORSIA and CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents