Datang Kazuo Shuangmiao Wind Farm Project
#542of 1935 in Renewable energy#247of 1084 in China#363of 1459 in CDM (UNFCCC)#411of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with a jurisdictional grid-based baseline and VVB-confirmed additionality, but limited transparency due to the absence of any monitoring data and several key parameters (FNRB, usage rates, buffer pool) not stated in the available documents. The ERR figure discrepancy between the PDD and validation report is explainable as an annual-versus-lifetime reporting difference rather than a substantive conflict.
Red Flags
- No monitoring report or monitoring period data found in the extracted record despite the project having been active since April 2019
- One of the four source documents is listed as 'unknown' in the evidence trail, weakening the documentation chain
- FNRB method and value, usage monitoring method, and buffer pool percentage are all absent from the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 148,691 | 0 | 148,691 | |
| Total | 148,691 | 0 | 148,691 |
Risk Indicators
VVB-confirmed; test type not specified
Wind avoidance; no reversal risk inherent
0% deemed negligible; reasonable for grid-fed wind
Jurisdictional grid EF (0.9139, 2017)
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →