Datang Keyouzhongqi Naimanpu and Haoyao Wind Farm Project
#1101of 1935 in Renewable energy#614of 1084 in China#832of 1459 in CDM (UNFCCC)#859of 1287 in ACM0002
Audit Analysis
A CDM-registered wind farm project in China using a jurisdictional grid-emission-factor baseline, which is structurally sound for the technology. However, the extracted record lacks detail on the additionality test, monitoring methodology, and buffer arrangements, and a material finding on the build-margin emission factor required a corrective action. Overall a moderate-quality project with inherent low permanence risk but notable documentation gaps.
Red Flags
- Material finding in the validation report: the build-margin (BM) emission factor calculation in PDD Version 03 was inconsistent with the registered PDD, requiring a corrective action to revise the calculation.
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving a gap in verifying the robustness of the additionality assessment.
- No monitoring period, FNRB method, or usage-monitoring method is stated in the available documents, limiting the ability to assess MRV quality.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type and VVB confirmation not stated in extracted recor
Wind avoidance project – no reversal risk
0 % deduction, deemed negligible – appropriate for wind
Jurisdictional grid EF (0.9139, 2019) – standard method
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated – dual-channel risk unconfi
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →