Datang Kezuohouqi Hariwusu 49.5MW Wind Farm Project
#1228of 1935 in Renewable energy#714of 1084 in China#952of 1459 in CDM (UNFCCC)#951of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China registered under CDM with a jurisdictional baseline and a 7-year crediting period (2019–2026). The validation report identified a material finding regarding an inconsistency in the Build Margin emission factor calculation, which required a corrective action. Several key data points—including additionality test details, monitoring results, and CORSIA/CCP eligibility—are absent from the extracted record, limiting confidence in the project's full compliance picture.
Red Flags
- Material finding (CAR-1) in the validation report: inconsistency in the Build Margin emission factor calculation in PDD Version 04, requiring correction to align with the registered PDD
- Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality assessment unverified in the extracted record
- No monitoring reports or verification reports were found; the only ERR figure (720,104 tCO₂e) appears to be the ex-ante validated estimate rather than a monitored result
- CORSIA eligibility and CCP approval status are not stated, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in available documents
Avoidance project – no reversal risk
0% deduction, deemed negligible (reasonable for wind)
Jurisdictional grid EF (2019), standardised
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →