Datang New Energy Wangtuan Phase One Wind Power Project
#837of 1935 in Renewable energy#427of 1084 in China#588of 1459 in CDM (UNFCCC)#649of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China using a standard jurisdictional grid-emission-factor baseline (ACM0002 v19.0), validated by CCSC. The project is methodologically sound for its sector, with appropriate leakage treatment and no reversal risk, but the extracted record lacks detail on the additionality test type, monitoring period, and several safeguards elements. A minor material finding (CL-1) was raised and closed without corrective actions.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the robustness of the additionality assessment unverified from available documents
- The PDD reports a total ex-ante estimate of 532,952 tCO₂e while the validation report states 76,136 tCO₂e — although this is consistent with a 7-year crediting period (532,952 ÷ 7 ≈ 76,136/year), the discrepancy is not explicitly reconciled in the documents
- No monitoring report is present in the evidence set; the monitoring period is not stated, limiting verification of actual performance against the ex-ante estimate
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test implied by CDM validation but type not stated in extrac
Avoidance project (wind); no reversal risk or events reporte
0% deduction, deemed negligible — appropriate for grid-conne
Jurisdictional grid EF (0.8404, 2019); standard for ACM0002
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →