Datang Ningxia Ningdong (Baitugang Town Changliushui) Wind Farm Project
#1230of 1935 in Renewable energy#716of 1084 in China#954of 1459 in CDM (UNFCCC)#953of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China using a jurisdictional grid-emission-factor baseline (0.7674 tCO2/MWh, 2019) with a 7-year crediting period. The project is structurally sound for a wind avoidance project, but the extracted record has notable gaps in additionality documentation, monitoring details, and a significant discrepancy between the PDD and validation report on total emissions reductions (529,655 vs 75,665 tCO2e).
Red Flags
- Total ERR in the PDD (529,655 tCO2e, June 2019) is approximately 7× the figure in the validation report (75,665 tCO2e, October 2019), indicating a major recalculation between documents
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverifiable from available data
- One of the four evidence documents is listed as 'unknown', reducing traceability of the evidentiary basis
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in extracted record
Avoidance project, no reversal events
0% deemed negligible, appropriate for wind
Jurisdictional grid EF, reassessed 2019
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →