Datang Tuquan Laoyeling Phase I Wind Farm Project
#1165of 1935 in Renewable energy#673of 1084 in China#885of 1459 in CDM (UNFCCC)#911of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a jurisdictional baseline and standard methodology (ACM0002), but the extracted record lacks explicit additionality test documentation, a stated monitoring period, and contains a material finding on build-margin calculation inconsistency. The project is inherently low-risk in terms of permanence and leakage, yet the documentation gaps and the unresolved CAR-1 finding limit confidence in the overall credit quality.
Red Flags
- Material finding CAR-1: inconsistency in build margin emission factor calculation in PDD Version 03, with a corrective action still required to revise the PDD
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality basis unverified in available documents
- Monitoring period is not stated in any available document, making it impossible to confirm the temporal basis of the verified ERR figure
- One of the four evidence documents is listed as 'unknown', reducing confidence in the completeness of the documentary record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type and VVB confirmation not stated in extracted recor
Wind avoidance project; no reversal events reported
0% deduction, deemed negligible — appropriate for grid-conne
Jurisdictional baseline, 2019 grid EF, reassessed 2019
Safeguards and benefit sharing mentioned; FPIC and grievance
CCP status and CORSIA eligibility not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →