Skip to main content
CDMWindChinaACM0002

Datang Yumen Changma First (east) 48MW Wind Farm Project

CDM-6850 ↗

#1231of 1935 in Renewable energy#717of 1084 in China#955of 1459 in CDM (UNFCCC)#954of 1287 in ACM0002

4.8/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
6.0
Documentation
4.0

Audit Analysis

A 48 MW onshore wind farm in China's Gansu province displacing grid electricity, validated under CDM methodology ACM0002 v19.0. The project presents low inherent risk (avoidance-type, no reversal exposure, negligible leakage), but the extracted record lacks explicit confirmation of the additionality test, monitoring-period details, and safeguards documentation. Two minor material findings were raised and closed during validation, with no corrective actions outstanding.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality basis unverified from available documents.
  • Safeguards documentation is contradictory: the PDD references safeguards while the validation report does not confirm them; no FPIC or grievance mechanism is documented.
  • No monitoring report or verification report is present in the evidence set; the monitoring period is not stated, limiting the ability to confirm ongoing MRV performance.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, appropriate for wind

Baseline

Jurisdictional grid EF, reassessed 2019

Safeguards

Contradictory; no FPIC or grievance documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents