Datang Yumen Changma First (north) 48MW Wind Farm Project
#1232of 1935 in Renewable energy#718of 1084 in China#956of 1459 in CDM (UNFCCC)#955of 1287 in ACM0002
Audit Analysis
A 48 MW onshore wind project in China validated under CDM methodology ACM0002 v19.0, with a jurisdictional grid baseline and a reasonable 0% leakage deduction appropriate for wind. The project lacks explicit additionality test documentation, confirmed safeguards, and any monitoring-period data, creating meaningful evidence gaps. The ERR figures in the PDD and validation report are consistent on a per-year basis (565,845 tCO₂e over 7 years ≈ 80,835 tCO₂e/year), but the absence of monitoring reports and FNRB data limits confidence in delivery tracking.
Red Flags
- Additionality test type and VVB confirmation are not stated in any available document; only the validation by CTI is recorded, leaving the specific investment or barrier test unverified in the extracted record.
- Safeguards are mentioned in the PDD but explicitly absent from the validation report; no FPIC, grievance mechanism, or benefit-sharing detail beyond a general statement is documented.
- No monitoring reports, FNRB values, or usage-monitoring methodology are available, so actual delivery against the 80,835 tCO₂e annual expectation cannot be independently verified.
- Grid emission factor is from 2017 (0.7674 tCO₂/MWh); no evidence of periodic grid-EF updates is found in the extracted record.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated; VVB validation implied but not explici
Avoidance project (wind); no reversal events
0% deduction justified as negligible; appropriate for grid-c
Jurisdictional grid EF (0.7674, 2017); reassessed 2019
No FPIC, grievance mechanism, or confirmed safeguards in val
CORSIA and CCP statuses not stated; dual-channel risk unasse
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →