Datang Zhaoyuan Jinling Wind Farm Phase I Project
#1541of 1935 in Renewable energy#988of 1084 in China#1327of 1459 in CDM (UNFCCC)#1176of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with a jurisdictional baseline and reasonable leakage treatment, but significant gaps in additionality verification, MRV detail, and a major discrepancy between the PDD and validation report on estimated emission reductions. The absence of a monitoring report and unconfirmed additionality testing limit confidence in the project's integrity and transparency.
Red Flags
- Additionality was not confirmed as verified by the VVB and no specific additionality test type is recorded in the extracted data, a fundamental CDM requirement
- The PDD (June 2019) reports 538,860 tCO2e while the validation report (August 2019) reports 76,980 tCO2e — a roughly 7-fold discrepancy in the claimed emission reduction figure
- No monitoring report or monitoring period data is present in the available documents, leaving actual performance unverified
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Not confirmed as VVB-verified; no test type recorded
no reversal e
0% deemed negligible; appropriate for grid-connected wind
Jurisdictional grid EF (0.8404, 2017); reassessed 2019
Safeguards and benefit-sharing mentioned; FPIC and grievance
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →