Skip to main content
CDMWindChinaACM0002

Datang Zhaoyuan Jinling Wind Farm Phase I Project

CDM-7244 ↗

#1541of 1935 in Renewable energy#988of 1084 in China#1327of 1459 in CDM (UNFCCC)#1176of 1287 in ACM0002

4.1/ 10
Integrity
3.5
Transparency
4.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A CDM wind energy project in China with a jurisdictional baseline and reasonable leakage treatment, but significant gaps in additionality verification, MRV detail, and a major discrepancy between the PDD and validation report on estimated emission reductions. The absence of a monitoring report and unconfirmed additionality testing limit confidence in the project's integrity and transparency.

Red Flags

  • Additionality was not confirmed as verified by the VVB and no specific additionality test type is recorded in the extracted data, a fundamental CDM requirement
  • The PDD (June 2019) reports 538,860 tCO2e while the validation report (August 2019) reports 76,980 tCO2e — a roughly 7-fold discrepancy in the claimed emission reduction figure
  • No monitoring report or monitoring period data is present in the available documents, leaving actual performance unverified

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Not confirmed as VVB-verified; no test type recorded

Permanence

no reversal e

Leakage

0% deemed negligible; appropriate for grid-connected wind

Baseline

Jurisdictional grid EF (0.8404, 2017); reassessed 2019

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents