Dingbian Zhangjiashan Wind Farm Phase I Project
#1359of 1935 in Renewable energy#823of 1084 in China#1089of 1459 in CDM (UNFCCC)#1050of 1287 in ACM0002
Audit Analysis
A CDM wind project in China validated by CCSC with a jurisdictional baseline and a 7-year crediting period (2019–2026). The validation report identified a material finding (CAR-1) regarding an inconsistency in the build margin emission factor calculation, requiring a PDD correction. Several key data points—including additionality test type, monitoring period, FNRB, and buffer pool—are absent from the extracted record, limiting confidence in the full picture.
Red Flags
- Material finding CAR-1: build margin emission factor calculation in the PDD was inconsistent with Tool version 7.0, requiring a corrective action to update the PDD
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving the additionality basis unverified in available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in extracted record; VVB validated but
Wind avoidance project; no reversal events reported; low inh
Deemed negligible with justification; reasonable for grid-co
Jurisdictional baseline; grid EF 0.7674 (2019); standardised
Safeguards mentioned and benefit sharing described; FPIC and
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →