Doc Cay Hydropower Project
#669of 1935 in Renewable energy#33of 80 in Vietnam#463of 1459 in CDM (UNFCCC)#235of 806 in AMS-I.D
Audit Analysis
The Doc Cay Hydropower Project is a small grid-connected hydro scheme in Vietnam displacing coal-heavy grid electricity, with a straightforward avoidance methodology (AMS-I.D) and no inherent reversal risk. The project's core methodology is sound, but documentation carries 11 administrative material findings and two inter-document contradictions (leakage justification and ERR figures) that reduce confidence in data consistency. Key verification data points—VVB-confirmed additionality, verified ERR totals, and FNRB methodology—are absent from the extracted record, limiting the depth of assurance available.
Red Flags
- Two contradictions between documents: leakage justification differs between the PDD (deemed negligible) and the 2020 monitoring report (quantified), and total ERR claimed differs between two monitoring reports (9,050 vs 44,482 tCO₂e)
- Additionality test (investment) is recorded but VVB confirmation of that test is not found in the extracted data, leaving the additionality claim unverified in the available record
- Eleven material findings and eleven corrective actions were raised by the VVB, all administrative but indicating a pattern of documentation sloppiness in the PDD and monitoring reports
- Total ERR verified figure is not present in any extracted document, preventing independent cross-check of claimed reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 25,680 | 0 | 25,680 | |
| 2016 | 29,517 | 0 | 29,517 | |
| 2017 | 33,959 | 0 | 33,959 | |
| 2018 | 33,452 | 0 | 33,452 | |
| 2019 | 42,864 | 0 | 42,864 | |
| 2020 | 44,482 | 0 | 44,482 | |
| 2021 | 9,050 | 0 | 9,050 | |
| Total | 219,004 | 0 | 219,004 |
Risk Indicators
Investment test present but VVB confirmation not found in re
Avoidance project, no reversal risk or events
0% deduction, reasonable for grid-connected hydro
Project-specific baseline, not jurisdictional
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →