Dogançay Weir and Hydroelectric Power Plant
#670of 1935 in Renewable energy#138of 295 in Turkey#390of 1339 in Verra (VCS)#517of 1287 in ACM0002
Audit Analysis
The Doğançay hydroelectric project has a VVB-confirmed investment additionality test and a jurisdictional baseline, but the verification report lists six material findings including calculation errors in baseline and project emissions formulas, and reversal risk is explicitly not addressed. The project delivered roughly 63% of the pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative (under-)delivery. Multiple contradictions between the 2013 PDD/validation and the 2025 verification report create uncertainty about the project's baseline character and leakage treatment.
Red Flags
- Six material findings in the 2025 verification report, including calculation errors in baseline and project emissions formulas (CAR 04) and an inconsistency in estimated emission reduction values between the MR and ER sheet (CL 01)
- Reversal risk is explicitly 'not addressed' and no non-performance risk rating was determined by the project proponent, despite the absence of a buffer pool
- Corrective actions required list is empty despite the verification report listing multiple CARs, raising questions about whether issues were resolved before issuance
- Contradiction on baseline method: the 2013 validation report describes a project-specific baseline while the 2025 verification report describes a jurisdictional baseline
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Reversal risk not addressed
Deemed negligible; reasonable for hydro
Jurisdictional per VVB but contradicted by validation report
FPIC conducted; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →