Dong Nai 4 Hydropower Project
#490of 1935 in Renewable energy#23of 80 in Vietnam#320of 1459 in CDM (UNFCCC)#366of 1287 in ACM0002
Audit Analysis
The Dong Nai 4 Hydropower Project is a CDM-registered hydro project with VVB-confirmed additionality (investment test) and a reasonable leakage treatment, but is undermined by four inter-document contradictions (additionality type, ERR figures, baseline method, crediting period), material meter-accuracy findings requiring 13 corrective actions, and the absence of documented FPIC or grievance mechanisms. Verified emissions for the monitoring period ran at roughly 63% of the pro-rata expectation derived from the PDD's ex-ante estimate, indicating conservative delivery rather than over-crediting.
Red Flags
- Four contradictions across documents on additionality type, ERR magnitude, baseline method, and crediting period dates reduce confidence in the data record
- Meter accuracy class 0.5s was below the required 0.2s during the monitoring period, necessitating conservative discount factors and a temporary monitoring system
- 13 Corrective Action Requests were raised during verification, indicating significant initial non-conformities in the monitoring plan
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 623,407 | 0 | 623,407 | |
| 2017 | 1,122,712 | 0 | 1,122,712 | |
| Total | 1,746,119 | 0 | 1,746,119 |
Risk Indicators
VVB-confirmed investment test
low inherent risk for hydro
0% deemed negligible, reasonable for grid hydro
Method contradicts across documents; grid EF stated
Safeguards and benefit-sharing mentioned; FPIC/grievance not
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →