Doruk HPP Run-of-River Hydro Project
#838of 1935 in Renewable energy#167of 295 in Turkey#523of 1339 in Verra (VCS)#651of 1287 in ACM0002
Audit Analysis
The Doruk HPP is a run-of-river hydro project in Turkey that displaces grid electricity (EF 0.5491 tCO2e/MWh) under VCS methodology ACM0002. Additionality was confirmed by the VVB, and the project delivered roughly 10% below its ex-ante estimate, which is a conservative outcome. However, a contradiction in the baseline method between the verification and monitoring reports, the absence of a stated additionality test type, and the lack of a buffer pool or explicit permanence mechanism limit confidence in the integrity of the credit.
Red Flags
- Baseline method is characterised as 'project-specific' in the verification report (Dec 2022) but as 'jurisdictional' in the monitoring report (Dec 2022) — an unresolved inconsistency that affects baseline credibility.
- Additionality was confirmed by the VVB, but the specific test type (investment, regulatory, or barrier) is not stated in any available document.
- No buffer pool percentage is reported, and permanence/reversal risk is marked as 'not addressed' (though the VVB notes the project is not AFOLU).
- 26 Corrective Action Requests were raised during verification (all resolved), indicating a non-trivial number of documentation or data issues that had to be corrected.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 9,724 | 0 | 9,724 | |
| 2015 | 39,184 | 0 | 39,184 | |
| 2016 | 37,123 | 0 | 37,123 | |
| 2017 | 36,778 | 0 | 36,778 | |
| 2018 | 47,442 | 0 | 47,442 | |
| 2019 | 37,057 | 0 | 37,057 | |
| 2020 | 33,318 | 0 | 33,318 | |
| Total | 240,626 | 0 | 240,626 |
Risk Indicators
VVB-confirmed but test type not stated
Avoidance project; no reversal risk
0% deduction; negligible for hydro
Contradiction between documents; project-specific
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →