Dos Mares Hydroelectric Project
#1599of 1935 in Renewable energy#10of 11 in Panama#1389of 1459 in CDM (UNFCCC)#1206of 1287 in ACM0002
Audit Analysis
The Dos Mares Hydroelectric Project is a CDM-registered hydro avoidance project in Panama with a 7-year crediting period, but the extracted record reveals significant data gaps and contradictions across key parameters. Two material findings and seven corrective actions were raised during verification, and the ERR figures, baseline method, and leakage justification are inconsistent between the validation and monitoring reports. The project's inherent low-risk profile as a hydro avoidance project is undermined by weak documentation of additionality, safeguards, and monitoring completeness.
Red Flags
- ERR figures contradict between the validation report (288,689 tCO2) and the monitoring report (248,362 tCO2), with the verified figure matching the full-period ex-ante estimate rather than a single-year actual, raising data reliability concerns
- Baseline method is stated as 'jurisdictional' in the validation report but 'project-specific' in the monitoring report, creating ambiguity about the actual baseline construction
- Additionality test type and VVB confirmation are not stated in any extracted document, a core CDM requirement
- Seven corrective actions were required, including incomplete QA/QC calibration procedures for monitoring equipment, indicating verification-stage quality issues
- FPIC and grievance mechanism documentation are absent from the extracted record despite safeguards being mentioned
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,690,166 | 0 | 1,690,166 | |
| Total | 1,690,166 | 0 | 1,690,166 |
Risk Indicators
Not stated in extracted record
Avoidance project, no reversals
0% deduction, justified
Method contradictory across docs
Mentioned but FPIC/grievance absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →