Dubai 200MW Photovoltaic Plant

CDM-10105 ↗

#107of 1935 in Renewable energy#2of 9 in United Arab Emirates#62of 1459 in CDM (UNFCCC)#76of 1287 in ACM0002

6.6/ 10
Integrity
7.0
Transparency
5.5
Claim Safety
7.0
Documentation
7.0

Audit Analysis

The Dubai 200 MW solar PV project is a low-risk avoidance-type credit with VVB-confirmed additionality, a jurisdictional grid baseline, and no reversal or leakage concerns. However, several transparency gaps (no verified ERR figure, no usage-monitoring method stated) and two inter-document contradictions (ERR magnitude and baseline classification) temper confidence. All material findings from validation were closed, and the project delivered roughly 102% of its pro-rata expectation for the elapsed monitoring period.

Red Flags

  • Baseline method is described as 'jurisdictional' in the 2023 monitoring report but as 'project' in the 2015 validation report — the discrepancy is unexplained in the extracted record.
  • Total ERR claimed in the monitoring report (810,124 tCO₂) differs from the validation report's ex-ante estimate (1,489,303 tCO₂); while the difference is largely attributable to different time bases, no explicit reconciliation is provided.
  • Stakeholder consultation documentation initially referenced an incorrect project capacity (13 MW vs 200 MW), raising a minor governance concern during validation.
  • No verified ERR figure (total_err_verified) is present in the extracted record, limiting independent cross-checking of claimed reductions.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justified as negligible

Baseline

Method label inconsistent across docs

Safeguards

Mentioned but details sparse; stakeholder doc error

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents