Skip to main content
CDMWindChileACM0002

El Arrayán Wind Farm Project

CDM-6985 ↗

#726of 1935 in Renewable energy#8of 31 in Chile#494of 1459 in CDM (UNFCCC)#567of 1287 in ACM0002

5.4/ 10
Integrity
7.0
Transparency
4.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

El Arrayán is a CDM wind farm project in Chile validated by KBS Certification Services with a combined additionality test and a grid-emission-factor baseline (0.6191 tCO2/MWh, 2020). The project type carries inherently low permanence and leakage risk, and all seven validation corrective actions were resolved. However, the absence of any monitoring-period data, verified emission reductions, or FNRB information limits the ability to confirm actual delivery against the claimed 1,345,533 tCO2e over the 2021–2028 crediting period.

Red Flags

  • No monitoring report or verified emission-reduction figure is available in the extracted record, making it impossible to confirm actual delivery against the claimed 1,345,533 tCO2e.
  • Baseline method is classified as 'project' in the validation report but 'jurisdictional' in the PDD — an inconsistency that, while minor for a grid-displacement wind project, signals imprecise documentation.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and some facts may be missing from the record.

Credit Vintages

IssuedRetiredAvailable
2021
1,329,03001,329,030
Total1,329,03001,329,030

Risk Indicators

Additionality

Combined test applied; VVB confirmation not explicitly state

Permanence

Wind project — no biogenic carbon, no reversal risk

Leakage

0% deduction, justified as negligible for grid displacement

Baseline

Grid EF 0.6191 (2020); project vs jurisdictional classificat

Safeguards

Safeguards mentioned; benefit-sharing described; FPIC and gr

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents