El Canadá Hydroelectric Project

CDM-0606 ↗

#1233of 1935 in Renewable energy#10of 15 in Guatemala#958of 1459 in CDM (UNFCCC)#956of 1287 in ACM0002

4.8/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.5
Documentation
5.5

Audit Analysis

The El Canadá Hydroelectric Project is a CDM-registered run-of-river hydro scheme in Guatemala that displaces grid electricity, with a combined additionality test and FPIC in place. However, the project record contains three material contradictions (leakage justification, ERR figures, and baseline method), a 0% leakage deduction with inconsistent documentation, and several missing monitoring parameters, limiting confidence in the credit claims. The project is an avoidance-type design with no inherent reversal risk, but the documentation gaps and data inconsistencies warrant caution.

Red Flags

  • Three contradictions across documents: leakage justification ('not addressed' in 2017 monitoring report vs 'deemed negligible' in 2013 validation report), total ERR (61,866 vs 246,627 in two monitoring reports), and baseline method ('project' vs 'jurisdictional')
  • Leakage deduction of 0% with justification described as 'not addressed' in the most recent monitoring report, despite the validation report having deemed it negligible
  • Grid emission factor of 0.495 tCO2/MWh is based on 2008 data, which is over 9 years old at the time of the 2017 monitoring report
  • Corrective actions required: parameters ABL, CapBL, APJ, and CapPJ were missing from the registered PDD and monitoring plan despite being required by methodology ACM0002 v13.0.0
  • Total ERR verified figure is not found in the extracted record, preventing independent verification of claimed credits

Credit Vintages

IssuedRetiredAvailable
2008
397,3780397,378
2012
228,8540228,854
2013
276,8570276,857
2015
348,3740348,374
2017
246,6270246,627
2018
81,130081,130
Total1,579,22001,579,220

Risk Indicators

Additionality

Combined test present; VVB confirmation not in record

Permanence

Avoidance project; no reversal risk

Leakage

0% deduction; justification inconsistent across docs

Baseline

Project-specific; method contradicted; 2008 grid EF

Safeguards

FPIC conducted; benefit sharing described

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents