El Chaparral Hydroelectric Project (El Salvador)
#762of 1935 in Renewable energy#2of 5 in El Salvador#534of 1459 in CDM (UNFCCC)#589of 1287 in ACM0002
Audit Analysis
El Chaparral is a small hydro displacement project under CDM with VVB-confirmed additionality and a reasonable 0% leakage assumption, but the record is hampered by two inter-document contradictions (baseline method and additionality test type), a low extraction confidence rating, and the absence of any monitoring-period data to verify actual delivery against the claimed 1,008,637 tCO₂e.
Red Flags
- Baseline method is stated as 'project-specific' in the validation report but 'jurisdictional' in the PDD — an unresolved contradiction that affects the credibility of the baseline calculation.
- Additionality test type is recorded as 'combined' in the validation report but 'investment' in an appendix — the scope of the additionality assessment is ambiguous.
- No monitoring period or monitoring report was found in the extracted record, making it impossible to verify whether the 1,008,637 tCO₂e claimed was actually delivered.
- Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, which undermines confidence in all extracted values.
- Five corrective action requests (CARs) were raised during validation, yet the corrective-actions-required list is empty, creating an inconsistency in the audit trail.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Hydro displacement, no reversal risk
0% deemed negligible, consistent with type
Project-specific, contradicts PDD, no reassessment data
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →