Eléctrica del Valle de México Wind Farm

CDM-3860 ↗

#545of 1935 in Renewable energy#4of 47 in Mexico#364of 1459 in CDM (UNFCCC)#413of 1287 in ACM0002

5.7/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A CDM wind farm project with VVB-confirmed additionality and conservative credit delivery (approximately 79% of pro-rata expectation), but undermined by five material findings, four required corrective actions, and a genuine contradiction in baseline methodology between the validation and monitoring reports. The project is fundamentally sound as an avoidance-type renewable energy credit, yet data quality issues and documentation gaps limit confidence in the underlying claims.

Red Flags

  • Baseline methodology is described as 'jurisdictional' in the monitoring report (2012) but as 'project' in the validation report (2011) — a genuine contradiction that undermines baseline robustness
  • Five material findings in the verification report, including emission factor calculation inconsistencies and a monitoring plan missing environmental and social parameters, with four corrective actions still required
  • Crediting period differs between the validation report (2010-09-29 to 2017-09-28) and the monitoring report (2011-02-02 to 2018-02-01), indicating the project start date was adjusted post-validation without clear documentation of the change

Credit Vintages

IssuedRetiredAvailable
2013
199,9420199,942
Total199,9420199,942

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justified as negligible for wind

Baseline

Jurisdictional per monitoring report, contradicted by valida

Safeguards

FPIC conducted, safeguards mentioned, grievance mechanism no

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents