Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI

CDM-5495 ↗

#98of 211 in Brazil#834of 1459 in CDM (UNFCCC)#861of 1287 in ACM0002

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A Brazilian wind farm project under CDM with a jurisdictional baseline and VVB-confirmed additionality, but the validation process surfaced serious calculation errors in grid emission factors, plant load factor evidence, and benchmark methodology that undermine confidence in the reported emission reductions. Multiple corrective actions were required, and the absence of verified ERR figures and several key monitoring parameters limits the ability to confirm actual delivery against claims.

Red Flags

  • CAR 01: Grid emission factor values applied in ER calculations were found to be incoherent with the supporting evidence provided, a fundamental issue for a wind project where the grid EF drives all reduction calculations
  • Nine corrective actions were required covering PLF evidence, project start date, emission factor methodology, benchmark/WACC calculation, investment analysis, sensitivity analysis, and monitoring plan QA/QC — indicating systemic weaknesses in the project documentation
  • PDD tracking changes were not provided as required by CDM instructions (CL 01), and the one-year-eight-month delay in project start was not sufficiently justified (CL 02)
  • Verified ERR figures are not stated in the extracted record, preventing independent confirmation of actual delivery against the 826,194 tCO2e claimed

Credit Vintages

IssuedRetiredAvailable
2020
249,3680249,368
2021
568,5110568,511
2022
826,1940826,194
Total1,644,07301,644,073

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible (appropriate for wind)

Baseline

Jurisdictional, but grid EF calculation flagged as incoheren

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents