Electricity generation through wind power project at Jaora-MP & Tenkasi-TN
#1361of 1935 in Renewable energy#731of 975 in India#1092of 1459 in CDM (UNFCCC)#441of 806 in AMS-I.D
Audit Analysis
A standard CDM wind power project in India validated by TÜV NORD CERT with a jurisdictional grid baseline and investment-test additionality. The project type carries inherently low permanence and leakage risk, but the extracted record contains no monitoring or verification data, a low extraction confidence rating, and 22 material findings from the validation process that point to significant initial documentation and calculation weaknesses. Overall, the project is methodologically sound but the available evidence base is thin and the initial submission quality was poor.
Red Flags
- 22 material findings in the validation report, including miscalculated first-year generation, incorrect tariff dates, missing WTG identification, and non-conforming sensitivity analysis — indicating a weak initial submission that required extensive correction
- No monitoring period, verified ERR, or usage monitoring method found in any available document, leaving the actual performance of the project entirely unverified in the extracted record
- Low extraction confidence across the document set, with at least one key document poorly readable and one document of unknown type
- Contradiction on crediting period: validation report states 2012-05-01 to 2022-05-01 while an undated appendix states 2012-01-01 to 2022-12-31
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal pathway
0% deduction, justified for grid-export wind
Jurisdictional grid EF, standard CDM approach
Safeguards mentioned but FPIC and grievance mechanism not do
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →