Energia dos Ventos I, II, III, IV and X CDM Project (JUN1184), Brazil
#66of 211 in Brazil#675of 1459 in CDM (UNFCCC)#733of 1287 in ACM0002
Audit Analysis
A CDM wind project in Brazil with a jurisdictional baseline and VVB-verified additionality, but undermined by 13 material findings spanning capacity inconsistencies, financial analysis errors, and an outdated grid emission factor. The project delivered roughly 51% of its pro-rata expected emissions reductions for the elapsed monitoring period, which is conservative, yet the baseline accuracy remains in question due to the unresolved capacity discrepancies. Documentation is extensive but carries significant quality concerns.
Red Flags
- Installed capacity is inconsistent across documents (109.2 MW vs 98.7 MW vs 89.2 MW), casting doubt on both the baseline and the additionality financial analysis
- Grid emission factor was not calculated using the most recent data available from the Brazilian DNA at the time of validation
- 13 material findings and 10 corrective actions were raised at validation, including errors in income tax calculation, OPEX alignment, and equity ratio justification
- Stakeholder consultation invitation letters were dated 2015, after the project start date of October 2013, raising procedural compliance concerns
- Verified ERR figure is not stated in the available monitoring report, leaving the actual credit issuance amount unconfirmed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but 13 material findings affect financial anal
Wind avoidance project, no reversal risk
0% deduction, deemed negligible for wind
Jurisdictional but grid EF outdated and capacity inconsisten
Safeguards mentioned, benefit sharing described, but FPIC an
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →