Audit Analysis
This industrial energy-efficiency project under the Indian Carbon Registry (ICR-418) uses a combined additionality test and a project-specific baseline, with no reversal risk given its non-AFOLU nature. However, the evidence base is limited to a single Project Design Document; no verification report or monitoring report was available, leaving additionality verification, actual emissions reductions, and MRV methodology unconfirmed. The claimed reductions are conservative relative to the pro-rata lifetime estimate, but the absence of verified data and a named VVB limits confidence in the project's integrity.
Red Flags
- No verification report or monitoring report was available; the entire evidence base consists of a single PDD, so additionality verification, MRV methodology, and actual emissions reductions remain unconfirmed.
- No VVB is named in the extracted record, and additionality verification by a VVB is not confirmed, despite a combined additionality test being described in the PDD.
- Leakage is set at 0% with a 'deemed negligible' justification but no quantified analysis or boundary definition is provided in the available documents.
- The PDD is dated 2026-01-22, which falls after the end of the stated monitoring period (2025-12-31), raising questions about whether this is a revised document or a data-entry anomaly.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 35,203 | 0 | 35,203 | |
| 2021 | 35,203 | 0 | 35,203 | |
| 2022 | 35,203 | 0 | 35,203 | |
| 2023 | 35,203 | 0 | 35,203 | |
| 2024 | 35,203 | 0 | 35,203 | |
| 2025 | 35,203 | 0 | 35,203 | |
| 2026 | 35,203 | 0 | 35,203 | |
| 2027 | 35,203 | 0 | 35,203 | |
| 2028 | 35,203 | 0 | 35,203 | |
| 2029 | 35,203 | 0 | 35,203 | |
| 2030 | 35,203 | 0 | 35,203 | |
| Total | 387,233 | 0 | 387,233 |
Risk Indicators
Combined test in PDD; VVB verification unconfirmed
Non-AFOLU; no reversal risk applicable
0% deduction, 'deemed negligible' — no quantified analysis
Project-specific; no reassessment date recorded
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →