Energy Efficiency Measures at NFL Vijaypur Unit I

ICR-418 ↗

#955of 1329 in Industrial#6of 9 in IN#64of 154 in Intl. Carbon Registry (ICR)#7of 12 in AMS-II.D

4.4/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

This industrial energy-efficiency project under the Indian Carbon Registry (ICR-418) uses a combined additionality test and a project-specific baseline, with no reversal risk given its non-AFOLU nature. However, the evidence base is limited to a single Project Design Document; no verification report or monitoring report was available, leaving additionality verification, actual emissions reductions, and MRV methodology unconfirmed. The claimed reductions are conservative relative to the pro-rata lifetime estimate, but the absence of verified data and a named VVB limits confidence in the project's integrity.

Red Flags

  • No verification report or monitoring report was available; the entire evidence base consists of a single PDD, so additionality verification, MRV methodology, and actual emissions reductions remain unconfirmed.
  • No VVB is named in the extracted record, and additionality verification by a VVB is not confirmed, despite a combined additionality test being described in the PDD.
  • Leakage is set at 0% with a 'deemed negligible' justification but no quantified analysis or boundary definition is provided in the available documents.
  • The PDD is dated 2026-01-22, which falls after the end of the stated monitoring period (2025-12-31), raising questions about whether this is a revised document or a data-entry anomaly.

Credit Vintages

IssuedRetiredAvailable
2020
35,203035,203
2021
35,203035,203
2022
35,203035,203
2023
35,203035,203
2024
35,203035,203
2025
35,203035,203
2026
35,203035,203
2027
35,203035,203
2028
35,203035,203
2029
35,203035,203
2030
35,203035,203
Total387,2330387,233

Risk Indicators

Additionality

Combined test in PDD; VVB verification unconfirmed

Permanence

Non-AFOLU; no reversal risk applicable

Leakage

0% deduction, 'deemed negligible' — no quantified analysis

Baseline

Project-specific; no reassessment date recorded

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-II.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents