Erzin-2 SPP
#1362of 1935 in Renewable energy#24of 75 in TR#49of 154 in Intl. Carbon Registry (ICR)#1051of 1287 in ACM0002
Audit Analysis
The Erzin-2 SPP is a solar PV avoidance project in Turkey with a straightforward jurisdictional baseline (2024 grid emission factor of 0.6261 tCO₂/MWh) and a combined additionality test, but the available record is limited to a PDD and one appendix with no verification report, no named VVB, and no monitoring data. The project type inherently carries low permanence and leakage risk, yet the absence of independent verification and the non-conduct of FPIC leave meaningful gaps in the integrity and transparency picture.
Red Flags
- No verification report or monitoring report is present in the extracted record; the VVB name is not stated in any available document.
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project being registered under an ICR standard that typically requires stakeholder engagement.
- Additionality is assessed via a combined test, but VVB confirmation of that test is not documented in the available record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 42,883 | 0 | 42,883 | |
| 2025 | 125,220 | 0 | 125,220 | |
| 2026 | 125,220 | 0 | 125,220 | |
| 2027 | 125,220 | 0 | 125,220 | |
| 2028 | 125,220 | 0 | 125,220 | |
| 2029 | 125,220 | 0 | 125,220 | |
| 2030 | 125,220 | 0 | 125,220 | |
| 2031 | 125,220 | 0 | 125,220 | |
| 2032 | 125,220 | 0 | 125,220 | |
| 2033 | 125,220 | 0 | 125,220 | |
| 2034 | 82,336 | 0 | 82,336 | |
| Total | 1,252,199 | 0 | 1,252,199 |
Risk Indicators
Combined test present but VVB confirmation not documented
Solar PV – no carbon stock, non-permanence inapplicable
0% deduction justified as negligible for solar PV
Jurisdictional grid EF (2024) but reassessment date not stated
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →