Skip to main content
VCSEnergy industries (renewable/non-renewable sources)South Africa Registry: RegisteredAMS-I.F

Evander Solar Solutions PV Grouped Project

VCS-4795 ↗

#1419of 1935 in Renewable energy#32of 59 in South Africa#995of 1339 in Verra (VCS)#24of 44 in AMS-I.F

4.5/ 10
Integrity
5.0
Transparency
4.2
Claim Safety
4.5
Documentation
3.8

Audit Analysis

A South African solar PV captive-use project under VCS with a jurisdictional baseline and VVB-verified investment additionality, but the validation report carries 13 corrective actions and 10 material findings that undermine confidence in the additionality evidence and ER calculations. No monitoring or verification data is available, and a 53% discrepancy in lifetime ERR between the PDD and the validation report raises over-crediting concerns. The project is at an early documentation stage with significant gaps that need resolution before credits can be reliably assessed.

Red Flags

  • Lifetime ERR differs by 53% between the PDD (115,953 tCO2e) and the validation report (177,163 tCO2e), with no explanation provided in the extracted record
  • 13 corrective actions required by the VVB, including missing investment decision date, unclear financial additionality assumptions (CAPEX, OPEX, tax rate, tariffs), and inconsistent ER calculations in the PDD
  • No monitoring or verification reports available; the project has no verified emissions reductions data despite a crediting period that began in June 2022
  • Leakage deduction of 0% justified only as 'deemed negligible' without a detailed quantitative analysis, and the PDD does not even address leakage
  • Low extraction confidence in the document analysis, with one document of unknown type among the eight used

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified but evidence gaps

Permanence

Not applicable – renewable generation

Leakage

0% with weak justification

Baseline

Jurisdictional but contradicted in PDD

Safeguards

FPIC and grievance present, benefit sharing unclear

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AMS-I.F.: Renewable electricity generation for captive use and mini-grid

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents