Everbright Zhenjiang Bundled Solar PV Power Generation Project_preCDM VER
Score Breakdown
Integrity
verified The verifier reported no material findings and no corrective actions were required in the verification report.
missing Additionality was not confirmed by the VVB in the extracted record, and permanence protections such as a buffer pool are not stated.
Transparency
verified The project has both a monitoring report and a verification report, with a named verifier and a defined monitoring period from 2011-08-27 to 2012-03-31.
missing Claimed versus verified emission reductions are not stated, and key MRV details such as usage monitoring and baseline reassessment are missing.
Claim Safety
verified The project uses a project-specific baseline under AMS-I.D, which at least identifies the baseline approach.
missing Leakage treatment is unclear because the verification report says it was not addressed, while the contradiction notes a quantified value in the monitoring report.
Documentation
verified Two official documents were used, and the extraction confidence is high.
missing Several core fields are not found in the extracted record, including additionality testing, buffer pool coverage, and safeguard procedures.
Detailed Analysis
Integrity
The project is a solar electricity activity under AMS-I.D with a project-specific baseline, and the verification report from TÜV NORD reports no material findings and no corrective actions. However, additionality is not confirmed by the VVB in the extracted record, buffer pool coverage is not stated, and reversal risk is not addressed, which weakens the integrity assessment.
Transparency
The documentation includes both a monitoring report and a verification report, and the monitoring period is clearly stated as 2011-08-27 to 2012-03-31. Even so, the extracted record does not state claimed or verified emission reductions, usage monitoring details, or a baseline reassessment date, so transparency is only moderate.
Claim Safety
Claim safety is constrained by missing or inconsistent evidence on leakage and by the absence of key over-crediting checks in the extracted record. The verification report says leakage was not addressed, while the contradiction notes that the monitoring report quantified it; I privilege the verification report because it is the assurance document, but the inconsistency still lowers confidence. No CORSIA or CCP status is stated, so dual-claim risk cannot be ruled out from the available record.
Documentation
Documentation quality is mixed: there are two official documents and the extraction confidence is high, which supports reliability. At the same time, several important items are not found in the extracted record, including additionality testing, buffer pool coverage, FPIC, grievance mechanism, and verified usage data, so the file is incomplete for a full quality review.
Overall
The project appears to be a straightforward solar PV activity with a named verifier, a defined monitoring period, and no material findings, but the evidence base is incomplete for a high-confidence credit-quality judgment. The contradiction on leakage is handled by privileging the verification report as the higher-priority assurance document, while still penalizing reliability because the monitoring report is said to quantify leakage. Because additionality, permanence, and safeguards are not well documented, the overall score remains modest.
Audit Analysis
This is a small solar electricity project with a project-specific baseline and no material findings reported by the verifier, but the record leaves important gaps on additionality, permanence, and safeguards. The leakage treatment is inconsistent across documents, and several key items needed to judge credit quality are not stated in the extracted record.
Project Description
Developer: Innovative Carbon Investment Co., Ltd. Type: Solar Thermal - Electricity Size: Small Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2012-04-01 → 2019-03-31 Estimated annual credits: 11567 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth
Red Flags
- Additionality is not confirmed in the extracted verification record, so the robustness of the emissions claim is unclear.
- The leakage justification is contradictory: the verification report says it was not addressed, while the monitoring report is described as quantified.
- Safeguards, grievance handling, and buffer pool coverage are not stated in the available documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 906 | 36 | 870 | |
| 2012 | 1,627 | 49 | 1,578 | |
| Total | 2,533 | 85 | 2,448 |
Cosa migliorerebbe questo punteggio
- Provide the full additionality demonstration and VVB confirmation, including the underlying test and evidence.
- Disclose verified emission reductions, leakage treatment, buffer or reversal provisions, and explicit safeguard documentation such as FPIC and grievance procedures.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No VVB-confirmed additionality found
No buffer pool or reversal treatment stated
Leakage treatment inconsistent
Project-specific baseline only
Safeguards mentioned but not documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →