Skip to main content
CDMWindChinaACM0002

Expansion Project of Huadian Inner Mongolia Huitengxile Wind Farm

CDM-1992 ↗

#214of 1935 in Renewable energy#71of 1084 in China#129of 1459 in CDM (UNFCCC)#153of 1287 in ACM0002

6.3/ 10
Integrity
7.0
Transparency
5.5
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A CDM wind expansion project in Inner Mongolia with a solid combined additionality test verified by TÜV SÜD and a jurisdictional grid baseline. The project is inherently low-risk on permanence (no biogenic storage), but transparency is weakened by a missing verified ERR figure, several unreported monitoring parameters, and a notable discrepancy between two monitoring reports' claimed emission reductions. All material findings from validation were resolved, and no corrective actions remain outstanding.

Red Flags

  • Two monitoring reports (March 2012 and September 2012) report materially different claimed emission reductions (44,316 vs 24,204 tCO₂e), raising a data-consistency concern even if they cover different reporting periods
  • Total verified ERR figure is absent from the extracted record, preventing independent cross-check of the claimed 24,204 tCO₂e
  • No grievance mechanism or FPIC documentation found in the available records, despite safeguards being mentioned in general terms

Credit Vintages

IssuedRetiredAvailable
2010
72,605072,605
2011
48,874048,874
2012
44,316044,316
2013
24,204024,204
Total189,9990189,999

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

Wind – no reversal risk

Leakage

0% – negligible, grid-fed

Baseline

Jurisdictional grid EF (2007)

Safeguards

Mentioned; FPIC & grievance not documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents