Feke II 69.58 MW Hydroelecrtic Power Plant

VCS-534 ↗

#169of 295 in Turkey#524of 1339 in Verra (VCS)#654of 1287 in ACM0002

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
4.0

Audit Analysis

The Feke II hydroelectric project in Turkey is a methodologically sound renewable energy project under ACM 0002 with VVB-verified additionality and a jurisdictional baseline reassessed in 2023. However, the project's documentation record is marred by 53 clarification requests, 27 corrective actions, and eight data contradictions across verification and monitoring reports, and the verified emissions reductions delivered only about 60% of the pro-rata expectation for the elapsed monitoring period due to lower water inflow and maintenance.

Red Flags

  • 53 clarification requests and 27 corrective actions were raised and closed during validation, indicating substantial initial documentation deficiencies
  • Verified ERRs (201,923 tCO2e) represent only ~60% of the pro-rata expectation (~335,000 tCO2e) for the 3.25-year monitoring period out of the 10-year crediting period, attributed to lower water inflow and maintenance
  • Eight contradictions identified across documents, including conflicting ERR values (201,923 vs 259,725 tCO2e), baseline method (jurisdictional vs project-specific), and additionality test type (regulatory surplus vs investment)
  • Minimum extraction confidence rated as low, indicating at least one key document was poorly readable or incomplete

Credit Vintages

IssuedRetiredAvailable
2011
160,335109,34250,993
2012
500187313
2014
4,7104,7100
2016
2,3852,3850
2018
5,0006004,400
2019
44,95244,9520
2020
84,71184,7110
2021
24,40815,3169,092
Total327,001262,20364,798

Risk Indicators

Additionality

VVB-confirmed regulatory surplus test

Permanence

Hydro project, no reversal risk, no events reported

Leakage

0% deduction, deemed negligible for run-of-river hydro

Baseline

Jurisdictional baseline, reassessed 2023

Safeguards

FPIC conducted, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09ACM 0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents