Fener Wind Power Project
#674of 1935 in Renewable energy#8of 75 in TR#13of 154 in Intl. Carbon Registry (ICR)#520of 1287 in ACM0002
Audit Analysis
The Fener Wind Power Project is a grid-connected wind avoidance project in Turkey using a jurisdictional baseline and a combined additionality test, with no reversal events and a reasonable 0% leakage deduction. However, the documentation record is thin—only a PDD is available, no verification or monitoring report is present, and the VVB identity is not stated. The claimed ERR of 49,291 tCO₂e for the 2021–2025 monitoring window appears well below the pro-rata expectation of roughly 154,500 tCO₂e derived from the 386,379 tCO₂e lifetime ex-ante estimate, though the absence of a verified figure prevents definitive assessment.
Red Flags
- No verification report or monitoring report is present in the evidence record; the VVB name is not stated, making independent verification of the additionality test and ERR figures impossible to confirm.
- The claimed ERR of 49,291 tCO₂e for the four-year monitoring period (2021–2025) is only about 32% of the pro-rata expectation (~154,500 tCO₂e) derived from the 386,379 tCO₂e lifetime ex-ante estimate, raising questions about the robustness of the ex-ante capacity-factor assumptions.
- A contradiction exists between two PDD versions (November vs December 2025) on whether benefit-sharing is described, indicating internal inconsistency in project documentation.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 6,296 | 0 | 6,296 | |
| 2022 | 12,289 | 0 | 12,289 | |
| 2023 | 12,289 | 0 | 12,289 | |
| 2024 | 12,289 | 0 | 12,289 | |
| 2025 | 12,289 | 0 | 12,289 | |
| 2026 | 28,535 | 0 | 28,535 | |
| 2027 | 67,301 | 0 | 67,301 | |
| 2028 | 67,301 | 0 | 67,301 | |
| 2029 | 67,301 | 0 | 67,301 | |
| 2030 | 67,301 | 0 | 67,301 | |
| 2031 | 33,189 | 0 | 33,189 | |
| Total | 386,380 | 0 | 386,380 |
Risk Indicators
Combined test present but VVB verification not stated
Avoidance project, no reversal events, low inherent risk
0% deduction, deemed negligible, appropriate for grid wind
Jurisdictional method, but last reassessment date not stated
FPIC, grievance mechanism, and safeguards all confirmed
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →