Fengxi Geothermal Space Heating Project in Xi’an city, Shaanxi Province

VCS-3648 ↗

#1082of 1861 in Renewable energy#706of 1181 in China#779of 1233 in Verra (VCS)#6of 10 in AM0072

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
3.8

Audit Analysis

The Fengxi Geothermal Space Heating Project has a VVB-verified combined additionality test and a consistent ex-ante ERR estimate of 175,260 tCO₂e, but suffers from notable gaps: no buffer pool is documented, reversal risk is unaddressed, the leakage treatment is contradictory across documents, and the overall extraction confidence is low. The project is a geothermal avoidance project with moderate structural protections, but the absence of permanence safeguards and incomplete monitoring documentation limit confidence in long-term credit integrity.

Red Flags

  • No buffer pool percentage is stated in any available document, leaving the 10-year crediting period (2021–2031) without a documented permanence backstop.
  • Reversal events are explicitly marked as 'not addressed' in the extracted record, despite the project having a 10-year crediting window.
  • The validation report (April 2023) rates leakage as 'deemed negligible' while the PDD (July 2022) does not address leakage at all — a direct contradiction that weakens the 0% deduction justification.
  • Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, which undermines confidence in the completeness of the evidence base.
  • The crediting period begins in January 2021, yet the validation report is dated May 2023 — a gap of over two years that raises questions about the timeline of project approval and credit issuance.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified combined test

Permanence

No buffer pool documented; reversal unaddressed

Leakage

0% deduction; PDD silent on leakage

Baseline

Project-specific; reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AM0072

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents