FERREIRA GOMES HYDRO POWER PLANT CDM PROJECT ACTIVITY
#546of 1935 in Renewable energy#21of 211 in Brazil#365of 1459 in CDM (UNFCCC)#414of 1287 in ACM0002
Audit Analysis
The Ferreira Gomes hydro project in Brazil is a straightforward grid-displacement project with a VVB-verified combined additionality test and a jurisdictional baseline reassessed in 2022. However, the available record is limited to the validation report and PDD, with no monitoring data yet and several key fields (FNRB, usage monitoring, CORSIA/CCP status) not stated. The apparent discrepancy in ERR figures between the PDD and validation report resolves to an annual-versus-lifetime basis difference (254,953 × 7 = 1,784,671), which is consistent rather than contradictory.
Red Flags
- Leakage treatment is inconsistent between documents: the validation report states leakage is 'deemed negligible' while the PDD describes it as 'quantified' — the basis for the 0% deduction is not fully transparent.
- No monitoring report or monitoring period is present in the extracted record, so actual performance against the claimed 254,953 tCO₂e/year cannot be verified.
- Three material findings (methodology version, PRC clarity, GWP values) required corrective actions, indicating the PDD was not fully compliant at validation.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 2,013,272 | 0 | 2,013,272 | |
| Total | 2,013,272 | 0 | 2,013,272 |
Risk Indicators
VVB-verified combined test
Hydro avoidance – low inherent reversal risk
0% deduction; justification inconsistent between PDD and val
Jurisdictional baseline, reassessed 2022
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →