Forestal y Papelera Concepción Biomass Residues Cogeneration Plant in Chile
#224of 352 in Biomass#23of 31 in Chile#1332of 1459 in CDM (UNFCCC)#35of 81 in ACM0006
Audit Analysis
This CDM biomass cogeneration project in Chile was verified by Allianz Zero Emissions but the 2012 monitoring report flagged eleven material findings, including a biomass composition that deviated sharply from the PDD (73% market sawdust versus 30% projected), an investment analysis not conducted per the CDM additionality Tool, and a leakage assessment that was not performed in accordance with the methodology. Seven corrective actions were required, and several key monitoring parameters (FNRB method, usage monitoring, verified ERR) are absent from the extracted record. The project over-delivered relative to its pro-rata expectation, but the underlying baseline and additionality documentation carry significant quality concerns.
Red Flags
- Eleven material findings in the 2012 monitoring report, including incorrect emission-reduction calculations, undefined baseline scenarios, and a monitoring plan missing key parameters (AVDy, Qproject plant,y)
- Biomass feedstock composition in operation (73% market sawdust) differed by more than double from the PDD projection (30%), undermining the baseline model
- Investment analysis was not carried out according to the CDM Tool for demonstration and assessment of additionality, despite the VVB confirming a combined test
- Leakage was deemed negligible at 0% but the assessment was not conducted in accordance with the methodology initially
- Seven corrective actions were required, including re-approval of PDD changes for increased capacity and participant changes
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but investment analysis not per CDM Tool
mixed evidence / unresolved risk
0% deemed negligible but not assessed per methodology initia
Project-specific, scenarios unclear in initial PDD, no reass
Safeguards mentioned but FPIC, grievance, benefit-sharing no
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →