Foumbouni-Mitsamiouli solar farm
#1103of 1935 in Renewable energy#707of 1339 in Verra (VCS)#357of 806 in AMS-I.D
Audit Analysis
The Foumbouni-Mitsamiouli solar farm is a registered VCS renewable energy project with a verified combined additionality test and a jurisdictional baseline, but it carries significant unresolved issues around the Mitsamiouli sub-project (capacity discrepancy, unverified commissioning date, insufficient information). Multiple contradictions across documents—particularly on safeguards, FPIC, and baseline method—undermine confidence in the project's documentation and claim robustness.
Red Flags
- Mitsamiouli plant actual capacity (5.4 MWp) exceeds the registered estimate (4 MWp), raising potential over-crediting risk if the higher output was used in calculations without proper adjustment.
- The most recent verification report (April 2026) reports FPIC as not conducted, no grievance mechanism, and safeguards not mentioned—directly contradicting the earlier verification report (July 2025) and the validation report, which all reported these as present.
- A material finding explicitly states 'Insufficient information to demonstrate additionality' and 'Insufficient information on activity instance – Mitsamiouli,' yet the VVB still issued a verification with only corrective actions rather than a non-conformity.
- Eight contradictions were identified across documents, including baseline method (jurisdictional vs. project-specific), ERR figures (1,579 vs. 1,350), and crediting period dates, indicating significant data reliability concerns.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 2,489 | 0 | 2,489 | |
| 2022 | 2,803 | 0 | 2,803 | |
| 2023 | 5,088 | 0 | 5,088 | |
| 2024 | 5,599 | 0 | 5,599 | |
| 2025 | 1,475 | 0 | 1,475 | |
| Total | 17,454 | 0 | 17,454 |
Risk Indicators
VVB-verified but material finding cites insufficient information
Renewable energy – no reversal risk
0% deduction, deemed negligible (reasonable for solar)
Jurisdictional per latest report, but contradicted by validation report
FPIC not conducted, no grievance mechanism, safeguards not documented (2026 report)
CORSIA and CCP statuses not stated – dual-channel risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →