Foz Do Chapecó Project

VCS-896 ↗

#1235of 1935 in Renewable energy#113of 211 in Brazil#844of 1339 in Verra (VCS)#958of 1287 in ACM0002

4.8/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

Foz do Chapecó is a large-scale hydroelectric avoidance project with confirmed additionality and reasonable safeguards, but it is undermined by significant data-quality issues (meter calibration lapses, eight corrective actions), a major grid emission-factor discrepancy between the PDD and monitoring report, and a baseline-method contradiction across documents. The project over-delivered relative to its ex-ante estimate, which is reassuring, yet the low extraction confidence and unresolved contradictions limit confidence in the verified figures.

Red Flags

  • Grid emission factor differs by nearly a factor of two between the PDD (0.1901 tCO₂/MWh) and the monitoring report (0.363 tCO₂/MWh), directly affecting the credit calculation.
  • Baseline method is described as 'project-specific' in the 2012 verification report but 'jurisdictional' in the 2021 monitoring report — a fundamental methodological inconsistency.
  • Eight corrective actions were raised by the VVB, including meter calibration gaps, data mismatches with CCEE records, and missing calibration certificates, indicating weak MRV data integrity.
  • The PDD (dated 2022-10-31) reports a claimed ERR of 7,115,229 tCO₂e while the verification report (2022-01-18) reports 12,450,836 tCO₂e verified — a 75% discrepancy that is not explained by period length alone.
  • Minimum extraction confidence is rated 'low', meaning at least one key document was poorly readable, reducing reliability of the extracted record.

Credit Vintages

IssuedRetiredAvailable
2010
148,323140,8857,438
2011
980,488943,68736,801
2012
741,403219,503521,900
2013
419,13351,645367,488
2014
10,000010,000
2015
10,000010,000
2016
10,000010,000
2017
10,000010,000
2018
400,0008,640391,360
2019
1,013,0001,005,1927,808
2020
29,80120,3019,500
Total3,772,1482,389,8531,382,295

Risk Indicators

Additionality

VVB-confirmed investment/combined test

Permanence

Avoidance project – no reversal risk

Leakage

0% deduction, quantified, reasonable for hydro

Baseline

Project-specific; method contradicted across docs

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents