Fuel Efficient Stoves in Zambia (Korea Carbon Management Ltd. CPA No.02)
#7of 7 in Zambia#515of 629 in Verra (VCS)#37of 46 in AMS-II.G
Audit Analysis
A CDM-to-VCS converted fuel-efficient stove project in Zambia with confirmed additionality and a quantified 5% leakage deduction, but undermined by 13 material findings, 11 corrective actions, a 2.09× discrepancy between the monitoring report's claimed ERs (216,223 tCO₂e) and the verification report's verified ERs (451,656 tCO₂e), and inconsistent stove-distribution figures across documents. The project's data reliability and baseline robustness are significantly weakened by its CDM legacy and unresolved eligibility questions.
Red Flags
- ERR figures differ by a factor of ~2.1 between the monitoring report (216,223 tCO₂e) and the verification report (451,656 tCO₂e) for the same monitoring period, raising serious data-reliability concerns
- Inconsistent stove-distribution numbers across documents: 30,000 vs 71,416 vs 80,000 target, flagged as a material finding in the verification report
- 13 material findings and 11 corrective actions identified by the VVB, including CDM eligibility inconsistencies, project start-date conflicts, and sample-size calculation errors
- Project-specific baseline with no stated reassessment date, and no buffer pool percentage documented in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 225,828 | 0 | 225,828 | |
| 2022 | 225,828 | 0 | 225,828 | |
| Total | 451,656 | 0 | 451,656 |
Risk Indicators
VVB-confirmed but test type not stated
Non-AFOLU (no reversal risk) but no buffer pool documented
5% quantified deduction with justification
Project-specific baseline; reassessment timing not stated
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →