Skip to main content
CDMHydroChinaACM0002

Fugong Labuluo Hydropower Project

CDM-2688 ↗

#1012of 1935 in Renewable energy#555of 1084 in China#745of 1459 in CDM (UNFCCC)#797of 1287 in ACM0002

5.1/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A CDM hydropower project in China using the well-established ACM0002 methodology, with a reputable VVB (TÜV NORD CERT) and pro-rata ER delivery of approximately 100% of the ex-ante expectation. However, seven material findings in the monitoring report reveal significant documentation and calculation compliance issues, and the additionality test type is not explicitly confirmed in the extracted record. Three contradictions between the validation and monitoring reports (baseline method, leakage justification, and ERR figures) reduce confidence in data consistency.

Red Flags

  • Seven material findings in the monitoring report (2022) flag incorrect emission-source demonstrations, wrong EGfacility,y definitions, PEy calculation errors, and EFgrid rounding errors in the ER calculation — all requiring corrective action
  • Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the actual baseline approach
  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving a gap in verifying a core CDM requirement
  • Leakage justification is contradictory: 'quantified' in the monitoring report versus 'deemed negligible' in the validation report, despite a 0% deduction in both

Credit Vintages

IssuedRetiredAvailable
2011
62,781062,781
2012
56,327056,327
2013
54,721054,721
Total173,8290173,829

Risk Indicators

Additionality

Test type not confirmed in extracted record

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, reasonable for hydro

Baseline

Project-specific, method contradicts across docs

Safeguards

Mentioned but FPIC and grievance not confirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents