Fujian Changle Wushan Wind Power Project

CDM-4984 ↗

#429of 1935 in Renewable energy#166of 1084 in China#276of 1459 in CDM (UNFCCC)#318of 1287 in ACM0002

5.9/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
7.0
Documentation
5.5

Audit Analysis

A CDM wind power project in China with a jurisdictional grid-emission-factor baseline and no material findings, but with notable documentation gaps around additionality testing, monitoring period scope, and FNRB methodology. The ERR figures are internally consistent once the lifetime-versus-annual distinction between the PDD and validation report is recognised. Overall a low-risk technology with moderate evidentiary completeness.

Red Flags

  • Additionality test type and explicit VVB confirmation are not stated in the extracted record, leaving the additionality basis unverified in the available documentation
  • Monitoring period is not stated, making it impossible to independently confirm the scope of the 45,773 tCO₂e verification figure
  • One of the four evidence documents is unidentified (listed as 'unknown'), reducing traceability

Credit Vintages

IssuedRetiredAvailable
2012
37,161037,161
Total37,161037,161

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Avoidance project; no reversal risk

Leakage

Deemed negligible; appropriate for grid wind

Baseline

Jurisdictional grid EF; reassessed 2019

Safeguards

Mentioned; FPIC and grievance not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents