Skip to main content
CDMWindChinaACM0002

Fujian Fuqing Gaoshan Phase II Wind Power Project

CDM-5994 ↗

#430of 1935 in Renewable energy#167of 1084 in China#277of 1459 in CDM (UNFCCC)#319of 1287 in ACM0002

5.9/ 10
Integrity
7.5
Transparency
4.0
Claim Safety
6.5
Documentation
4.5

Audit Analysis

A standard CDM wind power project with a solid jurisdictional baseline and VVB-confirmed combined additionality test, but the available record is limited to validation-stage documents with no monitoring reports or verified emission reductions. The low extraction confidence and absence of post-validation data constrain the overall assessment despite the inherently low-risk project type.

Red Flags

  • No monitoring reports or verified ERR figures found in the extracted record — the project's actual performance over its 7-year crediting period (2012–2019) cannot be confirmed
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of all extracted facts
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Wind – no reversal risk

Leakage

0% – negligible, justified

Baseline

Jurisdictional grid EF

Safeguards

Mentioned but not detailed

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents