Fujian Jiangle Dayan 32MW Hydropower Project
#493of 1935 in Renewable energy#199of 1084 in China#262of 1339 in Verra (VCS)#368of 1287 in ACM0002
Audit Analysis
A 32 MW small-scale hydropower project in China with VVB-confirmed additionality and a verified ERR that exactly matches the claimed figure for the monitoring period. The project carries moderate risk from a project-specific baseline, a 0% leakage deduction, and two inter-document contradictions (baseline method and leakage justification), compounded by a clear template error in the reversal-events field. Overall a mid-range quality project with identifiable but manageable documentation gaps.
Red Flags
- Reversal-events field contains a copy-paste error referencing a 'landfill gas project' in a hydropower project, indicating poor document quality control
- Contradiction between verification report (project-specific baseline) and monitoring report (jurisdictional baseline) on the same date undermines baseline confidence
- Meter calibration was not performed as required by the registered PDD until November 2022, eight years after the monitoring period ended
- Material finding notes that diesel generator leakage emissions were removed from the project description, raising questions about the completeness of the leakage assessment
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but test type not specified
Hydropower – inherently low reversal risk
0% deduction; diesel-generator finding complicates
Project-specific; contradiction with monitoring report
FPIC conducted; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →