Fujian Jiangle Gaotang Hydropower Project
#1169of 1935 in Renewable energy#676of 1084 in China#889of 1459 in CDM (UNFCCC)#914of 1287 in ACM0002
Audit Analysis
A CDM hydropower project with a solid combined additionality test verified by Deloitte-TECO and a reasonable zero-leakage justification for grid-displacement. However, significant data reliability concerns arise from contradictory ERR figures within the same monitoring report, a baseline method discrepancy between the verification and monitoring reports, and a mismatched crediting period between the PDD and later documents. Multiple key monitoring parameters (verified ERR, FNRB, usage monitoring method) are absent from the extracted record, limiting the ability to confirm actual delivery against claims.
Red Flags
- The 2024 monitoring report contains two different total ERR claimed values (184,909 and 80,710) within the same document, creating ambiguity about the actual credit volume
- Baseline method is stated as 'project' in the 2013 verification report but 'jurisdictional' in the 2024 monitoring report, raising questions about which baseline was actually applied
- Crediting period differs between the PDD (2008-04-01 to 2015-03-31) and the monitoring report (2009-01-16 to 2016-01-15), affecting the total credit calculation
- Meter calibration for EM3/EM4 was not performed as required by the registered PDD across multiple monitoring periods (2012, 2013, 2014), though later calibrations fell within acceptable ranges
- Total verified ERR, FNRB method, and usage monitoring method are not stated in the available documents, preventing independent verification of actual delivery
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 62,309 | 0 | 62,309 | |
| 2012 | 240,642 | 0 | 240,642 | |
| 2013 | 166,642 | 0 | 166,642 | |
| Total | 469,593 | 0 | 469,593 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% justified for grid displacement
Project-specific, method contradicted in later doc
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →