4.6/ 10
Integrity
5.5
Transparency
3.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A small CDM-era hydropower retrofit project in China with a verified investment-test additionality assessment and a reasonable zero-leakage justification, but severely limited post-validation data: no monitoring period, no verified emissions reductions, and a three-fold discrepancy between the PDD and validation-report ERR figures. The project's 2012–2015 crediting window has long closed, and the low extraction confidence across 20 documents further constrains confidence in the available record.

Red Flags

  • The PDD (Aug 2012) claimed 98,113 tCO₂e while the validation report (Aug 2012) recorded only 30,983 tCO₂e — a 68 % reduction that indicates the initial project documentation substantially overestimated credit potential before VVB correction.
  • No monitoring period, verified ERR, or FNRB data were found in any available document, leaving the actual delivery of credits entirely unverifiable from the extracted record.
  • Low extraction confidence across the 20-document set means at least one key document was poorly readable, reducing reliability of all extracted figures.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0 % deemed negligible, reasonable for small hydro

Baseline

Project-specific baseline, no reassessment data

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in any document

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents