Fujian Pingnan Daixi 50MW Hydropower Project

CDM-1998 ↗

#494of 1935 in Renewable energy#200of 1084 in China#321of 1459 in CDM (UNFCCC)#369of 1287 in ACM0002

5.8/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
5.5
Documentation
6.0

Audit Analysis

A 50 MW run-of-river hydropower project in Fujian, China, registered under CDM with a jurisdictional baseline and VVB-verified combined additionality test. The project is inherently low-risk in terms of permanence and leakage, but a 27% downward revision in the lifetime ERR between two monitoring reports, ten material findings, and five outstanding corrective actions raise data-reliability and documentation-completeness concerns.

Red Flags

  • Lifetime ERR dropped from 144,370 tCO₂ (Oct 2011 monitoring report) to 105,338 tCO₂ (Jun 2012 monitoring report), a 27% reduction that signals either an initial over-estimate or a mid-project recalculation not fully explained in the extracted record.
  • Ten material findings and five corrective actions were flagged during validation/monitoring, including a change in the metering system, a required baseline update with 2006 statistics, and a missing ecological-impact description in the PDD.
  • Leakage treatment is inconsistent across documents: the PDD references a quantified leakage figure while the 2012 monitoring report simply deems leakage negligible with a 0% deduction.
  • Total verified ERR for the monitoring period is not stated in the extracted record, preventing an independent cross-check of the claimed figure.

Credit Vintages

IssuedRetiredAvailable
2011
201,2420201,242
2012
144,3700144,370
2013
105,3380105,338
Total450,9500450,950

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Grid-displacement hydro, no reversal risk

Leakage

0% deduction, PDD/monitoring inconsistency

Baseline

Jurisdictional, reassessed 2008

Safeguards

Safeguards mentioned, FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents